Engineers Clinic
BeginnerEngineering trackFP-CV-02

Stormwater drainage design for a flood-prone city ward

Split a 1.6 km² ward into sub-catchments, work out peak flows with the rational method and an IDF curve, size the drains, and price them.

Core EngineeringCivil Engineering
6 Guided Steps38h Internship TierSubmit: Catchment map (PDF) + flow and drain design workbook + climate stress-test note + BOQ with cost + 5-page design reportVerified CertificateAI Rubric Graded
Program Overview

Industry project · for Sabarkantha Nagar Palika, the municipal body of a fast-growing tier-2 town planning drains for Ward 9

Ward 9 of Sabarkantha Nagar Palika covers 1.6 km² and has about 38,000 residents. Most streets have shallow open drains built 25 years ago, when the ward was half farmland. Now it is 70% built up. In the last three monsoons, the main road and two low-lying housing colonies flooded to knee height for four to six hours after heavy rain, and the bus depot was closed for a day.

The municipal engineer has a state grant to rebuild the ward's primary and secondary drains, but must send a design and cost estimate to the state urban development department in eight weeks. She wants a design she can defend: how much water each drain must carry, how big it needs to be, and what it costs.

You are given: - a ward map (you will trace it from OpenStreetMap or a satellite image and simplify it to 8 to 12 sub-catchments); - an IDF relationship for the town in the form i = K T^a / (t + b)^n, with K = 5.9, a = 0.16, b = 0.5 and n = 0.82 (i in cm/h, t in hours), which the engineer derived from IMD records; - a design return period of 5 years for secondary drains and 10 years for the primary drain; - the outfall: a nallah at the east edge, with invert level 1.8 m below the lowest road.

What you hand over: - a catchment map with areas, land use and runoff coefficients; - peak flow for every drain reach; - drain sizes, slopes and velocities; - a check of the design under 20% more intense rain; - a bill of quantities and cost estimate; - a short design report.

Done looks like a set of drains that carry the design storm without surcharging, keep velocities between self-cleansing and scour limits, and come in within the grant of ₹6.5 crore, or a clear explanation of why they cannot.

Catchment delineationRational methodIDF curvesOpen channel hydraulics (Manning)Quantity take-offTechnical report writing
What you submit

Catchment map (PDF) + flow and drain design workbook + climate stress-test note + BOQ with cost + 5-page design report

Stack: QGIS, Excel or Google Sheets, OpenStreetMap, AutoCAD or LibreCAD

How it is graded
  • Sound hydrology30

    Sub-catchments, runoff coefficients, times of concentration and intensities are reasonable and traced to sources.

  • Correct hydraulic design30

    Every reach carries its design flow with freeboard and velocities between the self-cleansing and scour limits.

  • Climate check10

    The design is tested at 20% higher intensity and the weak reaches are named with a fix.

  • Cost and quantities15

    The BOQ matches the drain schedule and the total is compared with the grant.

  • Report15

    The municipal engineer can send the report to the state with only her signature added.

Pass 60% · Merit 75% · Distinction 90%

Learning Outcomes
Delineate urban sub-catchments and assign runoff coefficients
build design storms from an IDF relationship
size drains with Manning and check velocities
test a design against heavier rain
prepare a BOQ and cost estimate
Target Audience

Engineering Students

Diploma, B.Tech, B.E., BCA, MCA, or M.Tech students seeking practical experience.

Aspiring Developers

Developers who want to build proof-of-work capstone projects for tech resumes.

Job Seekers

Graduates looking for AI-evaluated code review & verified industry credentials.