RF link budget and antenna choice for a rural point-to-point link

Design a 23 km 5.8 GHz link from a hilltop tower to a farm school: draw the path profile, check Fresnel clearance and tower heights, build the link budget, pick antennas, estimate availability and write a design an installer can build.

Core EngineeringElectronics Engineering
6 Guided Steps26h Internship TierSubmit: Python or spreadsheet calculations + path profile and clearance plot + link budget + antenna choice + availability estimate + channel plan + design report with BOMVerified CertificateAI Rubric Graded
Program Overview

Industry project · for Karoo Connect, a small wireless internet provider in the Northern Cape serving farms and schools from hilltop towers

Karoo Connect wants to bring broadband to Rietfontein Farm School, 23 km from its tower on Kopjeskop. The school has 210 learners, a new computer lab and no fibre within 60 km. The provider's operations manager wants at least 100 Mbps of usable throughput to the school, with availability of at least 99.9% over a year. The link will use licence-exempt equipment in the 5.8 GHz band.

What you know: - The tower site is at 1,240 m above sea level, with space for an antenna up to 30 m. The school is at 1,105 m, and the school can host a mast of up to 12 m. - A terrain profile along the path is given in task 1, with a ridge about 9 km from the tower. - The radio the provider uses has a maximum transmit power of 25 dBm and a receive sensitivity table by modulation, which you will take from a typical datasheet. - Antenna options are a 30 dBi dish and a 23 dBi flat panel. Short jumper cables lose about 0.5 dB at each end. - The regulator limits EIRP in this band. You must look up the current limit and design within it.

You will draw the path profile, calculate earth curvature and Fresnel zone clearance to set mast heights, build a link budget from transmit power to fade margin, choose antennas including the alignment difficulty, estimate availability from a multipath fade model, pick a channel plan, and write the design with a bill of materials. All of it is calculation in Python or a spreadsheet, with free tools. No radio equipment is needed.

Done looks like a link design an installer can build from: path profile and clearance plot, mast heights, a link budget table, an antenna choice with alignment notes, an availability estimate, a channel plan and a BOM with costs. If 100 Mbps at 99.9% is not possible within the EIRP limit, show what is possible and what would change it.

Path profilingFresnel zone analysisLink budget calculationAntenna selectionFade margin and availabilityFrequency planning
What you submit

Python or spreadsheet calculations + path profile and clearance plot + link budget + antenna choice + availability estimate + channel plan + design report with BOM

Stack: Python (numpy, matplotlib) or a spreadsheet, Radio and antenna datasheets, Online elevation data or a mapping tool, Regulator rules for the 5.8 GHz band

How it is graded
  • Correct path and clearance25

    The path profile includes earth curvature, first Fresnel zone clearance is checked at every point, and mast heights give at least 60% clearance over the ridge.

  • Correct link budget25

    EIRP, free-space path loss, gains, losses, received level and fade margin are calculated correctly for each modulation, within the regulator's EIRP limit.

  • Sound antenna and channel choices15

    Antenna choice weighs gain, beamwidth, wind load and alignment, and the channel plan avoids known interference with reasons.

  • Availability estimated20

    Availability is estimated from fade margin with a stated multipath model, and the modulation that meets 99.9% and 100 Mbps is identified.

  • Buildable design15

    The report gives mast heights, antenna models, alignment bearings and elevation angles, a BOM and a test plan an installer can follow.

Pass 60% · Merit 75% · Distinction 90%

Learning Outcomes
Draw a path profile with earth curvature
calculate Fresnel zone clearance and set mast heights
build a link budget to fade margin
choose antennas for gain, EIRP limits and alignment
estimate availability from fade margin
plan channels in a shared band
Target Audience

Engineering Students

Diploma, B.Tech, B.E., BCA, MCA, or M.Tech students seeking practical experience.

Aspiring Developers

Developers who want to build proof-of-work capstone projects for tech resumes.

Job Seekers

Graduates looking for AI-evaluated code review & verified industry credentials.