Geotechnical interpretive report from borehole logs, with bearing capacity and settlement
Turn six borehole logs and lab results into a ground model, derive design parameters, check shallow foundations for bearing and settlement, and recommend a foundation type.
Industry project · for Northbank Developments, a developer planning a five-storey mixed-use building on a former rail yard
Northbank Developments wants to build a five-storey mixed-use building on a 45 x 30 m plot of a former rail yard. The ground floor will be retail and the upper floors apartments. The structural engineer expects column loads of about 1,800 kN at interior columns and 1,100 kN at edge columns, on a 7.5 m grid.
A site investigation contractor has drilled six boreholes to 15 m and run standard penetration tests every 1.5 m. Their factual report is a stack of logs and lab sheets. Nobody has interpreted them yet. The developer wants to know, within four weeks, whether pad footings will work or whether the building needs piles, because piling would add around 8% to the budget.
You will write the geotechnical interpretive report. The ground broadly consists of: - 1.0 to 2.0 m of made ground with ballast and ash; - soft to firm clay to between 4.5 and 6.0 m, with undrained shear strength of roughly 35 to 65 kPa; - medium dense to dense sand to about 12 m, with SPT N rising from about 12 to 35; - very dense gravel below 12 m.
Groundwater was found at 2.2 to 2.8 m. In task 1 you will create the six logs and lab results consistently with this description, so that your data is realistic and stated as synthetic.
You will build a ground model and cross-sections, derive characteristic parameters, check pad footings for bearing capacity and settlement, assess a piled option, and recommend a foundation type with its risks.
Done means the developer can make the pad-or-pile decision from your summary page, and the structural engineer can design from your parameter table.
Borehole data set + ground model cross-sections + parameter table + bearing and settlement workbook + pile option calculation + interpretive report
Stack: Excel or Google Sheets, A cross-section drawing tool such as AutoCAD, LibreCAD or QGIS, Python with pandas (optional), A settlement or bearing spreadsheet you build
- Ground model20
Logs are consistent, cross-sections show layers and groundwater, and variability across the site is described.
- Design parameters25
SPT values are corrected and characteristic parameters are chosen cautiously with reasons.
- Bearing and settlement25
Pad footings are checked for bearing and total and differential settlement with correct methods.
- Pile option and recommendation20
A pile option is estimated and the recommendation weighs cost and risk clearly.
- Report quality10
The report separates fact from interpretation and states its limits.
Pass 60% · Merit 75% · Distinction 90%
Engineering Students
Diploma, B.Tech, B.E., BCA, MCA, or M.Tech students seeking practical experience.
Aspiring Developers
Developers who want to build proof-of-work capstone projects for tech resumes.
Job Seekers
Graduates looking for AI-evaluated code review & verified industry credentials.