Engineers Clinic
ExpertEngineering trackFP-CV-10

Embodied carbon comparison of two structural schemes for an office building

Design two structural schemes to preliminary level, take off quantities, calculate their upfront embodied carbon to EN 15978 modules, test the uncertainty, and recommend one.

Core EngineeringCivil Engineering
6 Guided Steps45h Internship TierSubmit: Method statement + two scheme designs + quantity workbook + carbon calculation + sensitivity analysis + board reportVerified CertificateAI Rubric Graded
Program Overview

Industry project · for Kestrel Place Developments, building a six-storey 7,200 m² office in Manchester for a developer with a Frankfurt parent company

Kestrel Place Developments is building a six-storey office of about 7,200 m² gross internal area in Manchester, on a 7.5 x 9.0 m grid with a central concrete core. The developer's parent company in Frankfurt has a company-wide target on upfront embodied carbon for new buildings, and its tenants increasingly ask for the figure in their leasing decisions.

The structural engineer has two candidate schemes: - scheme A, a reinforced concrete flat slab frame on pad foundations; - scheme B, a steel frame with composite metal-deck slabs on the same foundations type.

The developer wants to know which scheme has lower upfront carbon, by how much, and how confident that answer is. A previous consultant gave a single number for each scheme from a quick tool, and the two numbers were 6% apart. The board does not know whether 6% is real or noise.

You will: - set the scope and method in line with EN 15978 life-cycle modules and the IStructE guidance on calculating embodied carbon; - size both schemes to preliminary level; - take off quantities for substructure, frame, floors and core; - calculate modules A1 to A5 for both schemes using a stated database such as ICE and product EPDs where you have them; - run a sensitivity and uncertainty analysis on the choices that matter most; - write a recommendation with benchmarks.

Done means both schemes have quantities you can defend, carbon figures in kgCO2e per m² with the module breakdown, a sensitivity chart that shows whether the difference survives the uncertainty, and a recommendation the board can act on.

Preliminary structural sizingQuantity take-offLife-cycle assessment to EN 15978 modulesEmbodied carbon data (ICE, EPDs)Sensitivity and uncertainty analysisDecision reporting
What you submit

Method statement + two scheme designs + quantity workbook + carbon calculation + sensitivity analysis + board report

Stack: Excel or Google Sheets, Python with pandas and matplotlib (optional), ICE database, A structural sizing tool or span tables

How it is graded
  • Method and scope15

    The study boundary, modules, functional unit and data sources are stated and consistent for both schemes.

  • Credible schemes and quantities25

    Both schemes are sized to preliminary level and quantities are taken off traceably from the sizing.

  • Correct carbon calculation25

    A1 to A5 are calculated correctly per element and reported in kgCO2e/m² with the breakdown.

  • Honest uncertainty20

    Sensitivity and uncertainty tests show whether the difference between schemes is real.

  • Board recommendation15

    The report gives a clear recommendation with benchmarks and the conditions that would change it.

Pass 60% · Merit 75% · Distinction 90%

Learning Outcomes
Scope an embodied carbon study to life-cycle modules
size two structural schemes for comparison
take off quantities
calculate A1 to A5 carbon
test whether a difference survives uncertainty
Target Audience

Engineering Students

Diploma, B.Tech, B.E., BCA, MCA, or M.Tech students seeking practical experience.

Aspiring Developers

Developers who want to build proof-of-work capstone projects for tech resumes.

Job Seekers

Graduates looking for AI-evaluated code review & verified industry credentials.