Engineers Clinic
IntermediateEngineering trackCA-CP-40

EV Charging Network Siting for a Province

Internship role: Energy Planning Intern. Site fast chargers along provincial corridors to minimise range gaps under grid capacity limits, and report coverage achieved per dollar.

10 Guided Steps240h Internship TierSubmit: GitHub repo or evidence pack + live demo / report + README + milestone logbookVerified CertificateAI Rubric Graded
Program Overview

Internship role: Energy Planning Intern. Site fast chargers along provincial corridors to minimise range gaps under grid capacity limits, and report coverage achieved per dollar.

What you submit

GitHub repo or evidence pack + live demo / report + README + milestone logbook

Stack: Python, traffic and grid data, GeoPandas, optimisation

How it is graded
  • Problem & requirements15

    Loads, constraints, standards and success criteria are written down before the design starts.

  • Calculations & analysis30

    Hand calculations or simulation set out step by step with units, assumptions and a check against a second method or code limit.

  • Design output20

    Drawings, models, schematics or code that match the calculations and could be handed to the next person.

  • Validation & files15

    Test data, simulation files, calculation sheets or photos attached, with what each one shows.

  • Report & judgement20

    A clear report that states the result, its limits, cost or risk, and what you would change next.

Pass 60% · Merit 75% · Distinction 90%

Learning Outcomes
240-hour Canada programme. NRCan's ZEVIP programme funds charger deployment and asks for siting analysis.
Target Audience

Engineering Students

Diploma, B.Tech, B.E., BCA, MCA, or M.Tech students seeking practical experience.

Aspiring Developers

Developers who want to build proof-of-work capstone projects for tech resumes.

Job Seekers

Graduates looking for AI-evaluated code review & verified industry credentials.